Close Menu
Chronicle.ng
    Trending Stories
    Ballon d'Or: Sarina Wiegman named women’s coach of year

    Ballon d’Or: Sarina Wiegman named women’s coach of year

    September 22, 2025
    El-Rufai says Tinubu running most corrupt, intolerant government ever

    Presidency replies El-Rufai, ‘Tinubu will not extend his tenure beyond 2031’ 

    September 22, 2025
    Trump slaps $100k fee on H-1B visas, launches $1m ‘gold card’ residency

    Trump’s H-1B visa policy threatens Nigerian tech workers, others

    September 22, 2025
    Facebook X (Twitter) Instagram
    Trending
    • Ballon d’Or: Sarina Wiegman named women’s coach of year
    • Presidency replies El-Rufai, ‘Tinubu will not extend his tenure beyond 2031’ 
    • Trump’s H-1B visa policy threatens Nigerian tech workers, others
    • Israel to miss UN Security Council meeting on Gaza
    • India warns US visa fee hike could hit talent flow, families
    • Obasanjo did everything to retain power – Usman Bugaje
    • Dembele expected to beat Yamal, Raphinha to win Ballon d’Or
    • Badenoch knocks Starmer over recognition of Palestinian state
    Facebook X (Twitter) Instagram
    Chronicle.ngChronicle.ng
    Subscribe
    Monday, September 22
    • News
      • Nigeria News
      • World News
      • Headlines News
    • Politics
    • Business
    • Sport
    • Entertainment
    • Contact Us
    Chronicle.ng

    Buhari delivers dam after 27 years

    Chronicle EditorBy Chronicle EditorJanuary 26, 2019No Comments4 Mins Read
    Facebook Twitter Telegram WhatsApp
    Zobe Regional Water Supply Scheme abandoned after 27 years have been completed
    Zobe Regional Water Supply Scheme abandoned after 27 years have been completed
    Facebook Twitter WhatsApp
    Zobe Regional Water Supply Scheme abandoned after 27 years have been completed
    Zobe Regional Water Supply Scheme abandoned after 27 years have been completed

    The Zobe Regional Water Supply Scheme in Katsina abandoned for 27 years has been revived, completed and delivered by President Muhammadu Buhari.

    NAN reports that the dam, which was started in 1992, was revisited by the present administration to improve access to potable water for Katsina metropolis and environs.

    At an inspection visit to the site on Friday, the Minister of Water Resources, Mr Suleiman Adamu restated the desire of the present administration to complete all abandoned water projects.

    According to him, the Federal Government is excited about progress made in the LOT 1 of the project, expressing hope that the State Government will hasten the processes to reticulate the water to homes.

    “I came for inspection and celebration, because this project was started in 1992, and we want to celebrate the collaboration with the State Government that we have been true to our words in completing all ongoing projects.

    “I was so pleased that this has happened, we are excited that water will start flowing into Katsina and its environs before the end of January, and that has been accomplished.

    “This project has been waiting for 27 years, we are glad that we are coming to the tail end of this project. There is still work to be done, but there is sufficient water to start flowing into the communities,” he said.

    Mr Ibrahim Mai-Maje, Consultant of the scheme, said the Zobe Water supply scheme was specifically targeted at bringing water from Zobe River to Katsina Local Government Areas.

    He said three years ago, an MoU was signed between the state government and FG to bring water from Dutsinma, saying the water pumps, treatment plants, among others, had been completed and tested.

    Mai-Maje said no fewer than six LGAs of Dutsinma, Kankia, Charanchi, Katsina, Bindawa, Kurfi would benefit, adding that no less than 37,000 cubic metres of water would be treated and pumped to homes.

    “What is needed now is the Katsina State Government’s responsibility, this has been done since 1992, there is supposed to be an outlet that takes water into the state, then from there to other parts.

    “The remaining connection from Dutsinma and to other Local Government Areas is the responsibility of the State Government and they have reached an advanced stage for the consultant to complete the work,” he said.

    He added that the State Government was aware that it ought to put in remaining valves and fittings toward proper water reticulation.

    Mai-maje said the pumping into main Katsina tank have been tested and washed to test distribution channel network to the state, adding that the State Government has begun processes to see that water gets to the populace.

    The Deputy Governor, Alhaji Mannir Yakubu, commended the efforts of Federal Government and President Muhammadu Buhari for extending support towards completing all ongoing and abandoned water projects in the country.

    READ: Buhari signs executive order 007 to road projects

    ‘We thank the President and the ministry for giving this project life and bringing it to this stage, we will also do our own part.

    “It is certainly a project that we must honour our own part of the agreement, because the Federal Government has honoured her own part.

    “Really, this is going to bring a lot of relief, not only to Katsina and Dutsinma, but also to all the towns along the routes,” Yakubu said.

    NAN reports that the Federal Government had released N12 billion for onward implementation of Zobe Dam in Katsina State as part of its efforts to boost water supply across the country.

    Zobe dam has the potential to irrigate about 8,000 hectares of arable land and also be used for regional water supply.

    Share. Facebook Twitter Telegram WhatsApp

    Keep Reading

    El-Rufai says Tinubu running most corrupt, intolerant government ever

    Presidency replies El-Rufai, ‘Tinubu will not extend his tenure beyond 2031’ 

    Trump slaps $100k fee on H-1B visas, launches $1m ‘gold card’ residency

    Trump’s H-1B visa policy threatens Nigerian tech workers, others

    Israel-Iran war: Netanyahu praises Trump’s role in air defense

    Israel to miss UN Security Council meeting on Gaza

    Trump slaps $100k fee on H-1B visas, launches $1m ‘gold card’ residency

    India warns US visa fee hike could hit talent flow, families

    Nigeria: Obasanjo, Abdulsalami, others to unveil health hub in Abuja

    Obasanjo did everything to retain power – Usman Bugaje

    Kemi Badenoch says, I don’t identify with Nigeria anymore

    Badenoch knocks Starmer over recognition of Palestinian state

    Add A Comment
    Leave A Reply Cancel Reply

    Subscribe to News

    Be the first to get the latest news updates from ChronicleNG about world, sports, politics etc

    Ballon d'Or: Sarina Wiegman named women’s coach of year

    Ballon d’Or: Sarina Wiegman named women’s coach of year

    September 22, 2025
    El-Rufai says Tinubu running most corrupt, intolerant government ever

    Presidency replies El-Rufai, ‘Tinubu will not extend his tenure beyond 2031’ 

    September 22, 2025
    Trump slaps $100k fee on H-1B visas, launches $1m ‘gold card’ residency

    Trump’s H-1B visa policy threatens Nigerian tech workers, others

    September 22, 2025
    Israel-Iran war: Netanyahu praises Trump’s role in air defense

    Israel to miss UN Security Council meeting on Gaza

    September 22, 2025
    Trump slaps $100k fee on H-1B visas, launches $1m ‘gold card’ residency

    India warns US visa fee hike could hit talent flow, families

    September 22, 2025
    Facebook X (Twitter) Instagram
    • Politics
    • News
    • Sports
    • Business
    • About Us
    © 2025 ChronicleNG

    Type above and press Enter to search. Press Esc to cancel.